CIEMAT Publications
ISSN: 2695-8864 | NIPO: 832-22-011-4
PUBLISHED IN 2022
Informes técnicos CIEMAT
Radiation validation of the CMS drift tube chambers for HL-LHC
Redondo Ferrero, D.D.; de Lara Rodríguez, C.; Fernández Bedoya, C.; Redondo Fernández, I.; Cela Ruiz, J.M.; Navarro Tobar, A.; Sastre Álvaro, J.; León Holgado, J.
Free
Abstract
This document describes the results of the performance of the OBDTv1 board when irradiated under a mixed field at the CHARM irradiation facility at CERN. The OBDTv1 boards is in charge of the time digitization of the signals from the CMS Muon Drift Tube chambers for operation during HL-LHC. This board will be embedded into the iron yoke of the CMS detector and thus, will receive a moderate dose during its operation under the HL-LHC. Therefore, it is critical to characterize its performance under realistic radiation field conditions.
A dedicated test stand has been built to study the behavior of the electronics under radiation. This test stand was brought to CHARM in November 2021 and the board was irradiated for a period of 12 days, accumulating a factor 5 the maximum dose expected. The test stands, the irradiation campaign and the consequent effects of the different electronic components that build the OBDTv1 under this radiation are described in this note.
